PROJECT INFORMATION
The project is invested by the National Power Transmission Corporation (EVNNPT), using capital mobilized and allocated by EVNNPT according to plan, SPMB represents EVNNPT to manage the project, and Construction Joint Stock Company Power 2 is the design unit. Electricity Construction Company Limited 2 is the construction unit, Dai Long Trading Manufacturing Electric Wire and Cable Co., ltd supplies wires and accessories, Power Transmission Company 4 is the consulting, supervision and reception unit. Operational management when the project is completed.
After completion of the project, the load capacity of the existing 220kV Ben Tre – My Tho transmission line will be increased, improving load carrying capacity, contributing to releasing capacity of factories in Duyen Hai Power Center to ensure stable electricity supply. , continuously to serve the economic and social development of Ben Tre province, Tien Giang province and surrounding areas.