SUPPLYING POWER CABLES FOR HAU GIANG 20MW BIOMASS POWER PLANT PROJECT

  • NAME OF PROJECT
    HAU GIANG BIOMASS POWER PLANT PROJECT
  • LOCATION
    Hau Giang
  • YEAR
    2024
  • PRODUCTS SUPPLIED
    Low and medium voltage underground cables

Project information

PROJECT INFORMATION

Information about the project

The project is invested by Hau Giang Biomass Energy Joint Stock Company (HBE), with the goal of investing, developing, constructing and operating, first of all the Bioelectric Power Plant. Hau Giang has an installed capacity of 20MW.

When put into operation, Hau Giang Biomass Power Plant will be the first biomass power plant using rice husk fuel to come into operation in Vietnam.

Location: provincial road 930, Area 5, Thuan An ward, Long My town, Hau Giang province (next to the confluence of Nuoc Duc river and Cai Ban canal).

With an area of more than 10 hectares, including the power plant area, factory connection road, operation management area and expansion reserve area.

Usable water surface area: about 0.55 hectares.

Project meaning

– Regarding energy security: contributing to ensuring energy supply for the region, taking advantage of the existing resources and infrastructure of Hau Giang province.

– Economically: contributing to promoting the development of biomass fuel collection, transportation, and preliminary processing networks; attract more investment capital to develop renewable energy both domestically and internationally.

– Social aspect: helps increase income for people in the area.

– Regarding the environment: contributing to reducing greenhouse gas emissions, taking advantage of agricultural waste as input fuel for electricity production according to the circular economy model and sustainable development.

Information about EPC general contractor

Electrical Construction Consulting Joint Stock Company 2 (PECC2) has been affirming its position as a multi-functional EPC contractor, with a team of human resources with recognized professional qualifications. PECC2 is committed to meeting service quality and efficiency, ensuring project completion on schedule, within budget and to customer satisfaction.

PECC2 provides integrated and comprehensive EPC solutions for projects across Vietnam and around the world, throughout all stages of the project life cycle, from idea generation to exploitation, use, including operation and maintenance for the entire project. PECC2 has been involved for decades with fossil or renewable energy projects, both substation and transmission line projects.

Project location

Other Construction

  • NAME OF PROJECT: Luong Hoa Residential Area
  • LOCATION: Luong Hoa Commune, Ben Luc District, Long An Province
  • YEAR: 2024
  • PRODUCTS SUPPLIED: AL/XLPE/PVC 4x185 – 0,6/1kV
  • NAME OF PROJECT: 500kV line Circuit 3
  • LOCATION: Ha Tinh
  • YEAR: 2024
  • PRODUCTS SUPPLIED: STEEL CORE ALUMINUM CABLE - ACSR 507/104 (Code 612 Crocus)
  • NAME OF PROJECT: Long Thanh International Airport
  • LOCATION: Dong Nai
  • YEAR: 2024
  • PRODUCTS SUPPLIED: LOW VOLTAGE CABLES AXV 240mm2 - 0,6/ 1kV 
  • NAME OF PROJECT: 500kV Quynh Luu - Thanh Hoa line project
  • LOCATION: Nghe An - Thanh Hoa
  • YEAR: 2024
  • PRODUCTS SUPPLIED: Steel core aluminum conductor ACSR 400/51, Steel core aluminum alloy conductor AACSR 400/91, PHLOX 116 lightning protection wire
  • NAME OF PROJECT: Supply and installation of 11MVA electrical equipment for customers in Kratie province
  • LOCATION: Cambodia
  • YEAR: 2023
  • PRODUCTS SUPPLIED: AAC bare conductor 240mm2
  • NAME OF PROJECT: Nam Dinh 1 - Pho Noi 500kV Thermal Power Plant
  • LOCATION: Nam Dinh
  • YEAR: 2024
  • PRODUCTS SUPPLIED: ACSR 330/43 conductor cable, PHLOX - 116.2 lightning protection cable
  • NAME OF PROJECT: Krong Buk 1 wind power plant, Krong Buk district
  • LOCATION: Dak Lak
  • YEAR: 2020
  • PRODUCTS SUPPLIED: Medium voltage underground cable
  • NAME OF PROJECT: SUPPLY THE PROJECT RAISING THE LOAD CAPACITY OF THE 220KV VIET TRI - VINH TUONG TRANSMISSION LINE
  • LOCATION: Viet Tri - Vinh Luong
  • YEAR: 2022
  • PRODUCTS SUPPLIED: Aluminum conductor composite 507mm2 (ACCC507)
  • NAME OF PROJECT: 01 24KV UNDERGROUND CABLE FROM E1.8 YEN PHU STATION POWER SUPPLY FOR LOTTE MALL WEST LAKE HANOI
  • LOCATION: Hanoi
  • YEAR: 2022
  • PRODUCTS SUPPLIED: Medium voltage submarine cable 12,7/22(24)kV- Cu/XLPE/PVC/DSTA/PVC-3x400mm2-CTSr-WS
  • NAME OF PROJECT: SPMB ELECTRICIZED ACCC® Conductor ROPE REPLACEMENT PROJECT 220KV
  • LOCATION: Ben Tre - My Tho
  • YEAR: 2020
  • PRODUCTS SUPPLIED: ACCC® Conductor ULS 314.