supply power cables for renovation of south of saigon 110kv branch 2
SUPPLY POWER CABLES FOR RENOVATION OF SOUTH OF SAIGON 110KV BRANCH 2
NAME OF PROJECT
Renovation of South of Saigon 110kV Branch 2
LOCATION
TP. Hồ Chí Minh
YEAR
2023
PRODUCTS SUPPLIED
Dây nhôm lõi composite ACCC240, Dây chống sét Phlox 94.1
Project information
PROJECT INFORMATION
The project is invested by the Ho Chi Minh City Power Corporation LLC and managed by the Ho Chi Minh City Power Grid Project Management Board
Project objectives are to:
Renovate to improve load capacity, replace the existing 240mm2 ACSR wire with 240 composite aluminum core wire or equivalent and renovate the pillar head to ensure the protection angle of the lightning wire is ≤ 0°.
Ensuring the ability to supply power to the area when Phong Phu 110kV station is connected to the line, preventing line overload.
Reduce power loss on the transmission grid, increase overall production and business efficiency for Ho Chi Minh City’s power system.
In accordance with Decision No. 4690/QD-BCT dated December 15, 2017 of the Ministry of Industry and Trade.