Công Ty TNHH TM - SX Dây và Cáp Điện Đại Long
0

MODERNIZING THE SYSTEM OF POWER SOURCES AND ELECTRICAL GRIDS OF PHU QUY ISLAND DISTRICT

  • NAME OF PROJECT
    Modernize the source system and network of Phu Quy island district
  • LOCATION
    Phu Quy Island District (Binh Thuan)
  • YEAR
    2017
  • PRODUCTS SUPPLIED
    Electrical cables of all kinds

Project information

In Phu Quy island district (Binh Thuan), the Southern Power Corporation (EVNSPC) has officially put the project “Development and modernization of the source system and electrical grid of Phu Quy island district” into operation and operation. mounting signs for this project.

 

 

 

 

 

 

 

 

 

 

 

 

 

Mounting the signboard of “Developing and modernizing the source system and electricity grid of Dao Phu Quy district”.

Project “Development and modernization of power system and grid of Dao Phu Quy district” under the Supporting Program for development of electricity sector reform policy phase 3 (DPL3) borrowed from the World Bank (WB) and sources reciprocal capital EVNSPC, with a total investment of nearly VND 271 billion(10,6 million $). The project is invested by EVNSPC and Binh Thuan Power Company manages the project.

Project objectives are to modernize sources and power grids in Phu Quy Island district; Constructing and operating energy sources on the island with modern technology, meeting the optimal automatic operation of diesel-wind sources, and solar energy sources and energy storage systems in the future.

At the same time, the project also develops the power system and grid to meet the increasing electricity demand on the island district, improving the reliability of 24-hour power supply, safety in power supply, and modernization. electricity business, management and operation of the power grid and contribute to ensuring security – national defense of islands and islands, serving socio-economic conditions in Tien Phong island district.

Started construction in February 2017, after more than two years of construction, construction and installation of equipment, the project has completed quality assurance, operating a modern, safe and reliable electrical system. , ensuring 24-hour electricity supply with selling price equal to land price.

On this occasion, the Labor Union of Binh Thuan province officially attached the project “Development and modernization of the source system and power grid of Phu Quy island district” to celebrate the 90th anniversary of the establishment of Vietnam Trade Union (July 28). / 1929 – July 28, 2019) and 65 years of Vietnam Electricity Industry Traditional Day (December 21, 1954 – December 21, 2019).

Project location

Other Construction

  • NAME OF PROJECT: Luong Hoa Residential Area
  • LOCATION: Luong Hoa Commune, Ben Luc District, Long An Province
  • YEAR: 2024
  • PRODUCTS SUPPLIED: AL/XLPE/PVC 4x185 – 0,6/1kV
  • NAME OF PROJECT: 500kV line Circuit 3
  • LOCATION: Ha Tinh
  • YEAR: 2024
  • PRODUCTS SUPPLIED: STEEL CORE ALUMINUM CABLE - ACSR 507/104 (Code 612 Crocus)
  • NAME OF PROJECT: Long Thanh International Airport
  • LOCATION: Dong Nai
  • YEAR: 2024
  • PRODUCTS SUPPLIED: LOW VOLTAGE CABLES AXV 240mm2 - 0,6/ 1kV 
  • NAME OF PROJECT: HAU GIANG BIOMASS POWER PLANT PROJECT
  • LOCATION: Hau Giang
  • YEAR: 2024
  • PRODUCTS SUPPLIED: Low and medium voltage underground cables
  • NAME OF PROJECT: 500kV Quynh Luu - Thanh Hoa line project
  • LOCATION: Nghe An - Thanh Hoa
  • YEAR: 2024
  • PRODUCTS SUPPLIED: Steel core aluminum conductor ACSR 400/51, Steel core aluminum alloy conductor AACSR 400/91, PHLOX 116 lightning protection wire
  • NAME OF PROJECT: Supply and installation of 11MVA electrical equipment for customers in Kratie province
  • LOCATION: Cambodia
  • YEAR: 2023
  • PRODUCTS SUPPLIED: AAC bare conductor 240mm2
  • NAME OF PROJECT: Nam Dinh 1 - Pho Noi 500kV Thermal Power Plant
  • LOCATION: Nam Dinh
  • YEAR: 2024
  • PRODUCTS SUPPLIED: ACSR 330/43 conductor cable, PHLOX - 116.2 lightning protection cable
  • NAME OF PROJECT: Krong Buk 1 wind power plant, Krong Buk district
  • LOCATION: Dak Lak
  • YEAR: 2020
  • PRODUCTS SUPPLIED: Medium voltage underground cable
  • NAME OF PROJECT: SUPPLY THE PROJECT RAISING THE LOAD CAPACITY OF THE 220KV VIET TRI - VINH TUONG TRANSMISSION LINE
  • LOCATION: Viet Tri - Vinh Luong
  • YEAR: 2022
  • PRODUCTS SUPPLIED: Aluminum conductor composite 507mm2 (ACCC507)
  • NAME OF PROJECT: 01 24KV UNDERGROUND CABLE FROM E1.8 YEN PHU STATION POWER SUPPLY FOR LOTTE MALL WEST LAKE HANOI
  • LOCATION: Hanoi
  • YEAR: 2022
  • PRODUCTS SUPPLIED: Medium voltage submarine cable 12,7/22(24)kV- Cu/XLPE/PVC/DSTA/PVC-3x400mm2-CTSr-WS