Công Ty TNHH TM - SX Dây và Cáp Điện Đại Long
0

SUPPLYING CABLE FOR NATIONAL ELECTRICITY POWER SUPPLY PROJECT FOR NHON CHAU ISLAND COMMUNE (BINH DINH)

  • NAME OF PROJECT
    Name of project: SUPPLYING CABLE FOR NATIONAL ELECTRICITY POWER SUPPLY PROJECT FOR NHON CHAU ISLAND COMMUNE (BINH DINH)
  • LOCATION
    Binh Dinh
  • YEAR
    2020
  • PRODUCTS SUPPLIED
    Power cable

Project information

On the afternoon of April 17, 2020, the Project Steering Committee for the national grid supply by submarine cable to Nhon Chau island commune, Binh Dinh province by online form at 3 bridge points: EVNCPC Head Office, Binh Dinh PC and PC Phu Yen chaired by EVNCPC Deputy General Director Le Nam Hai. Attending at Binh Dinh PC Bridge point were Mr. Ngo Hoang Nam – Chairman of Quy Nhon City People’s Committee, Mr. Ngo Van General – Director of Binh Dinh Department of Industry and Trade and Mr. Huynh Ngoc Viet – Director of Binh Dinh PC.

Project of supplying electricity by submarine cable to Nhon Chau island (Binh Dinh) invested by EVNCPC includes 4 items: 22kV output compartment at Song Cau 110kV transformer station and 22kV on land line in TX area. Song Cau; to build a new 22kV submarine cable line single-stranded across the sea, more than 10km in length, connecting from the 22kV Hoa An cutting station (Xuan Hoa commune, Song Cau town) to Nhon Chau island commune; building Nhon Chau 22kV cutting station, 2 22 / 0.4kV transformer stations with a total capacity of 650kVA; building telecommunication systems and information cables … The total cost of implementing the project is nearly 351.5 billion dong from the non-refundable ODA funded by the EU.

The project has been implemented since April 2020 and strives to complete energizing by September 2020,

Dự án có quy mô xây dựng ngăn xuất tuyến 22kV tại trạm biến áp 110kV Sông Cầu và đường dây 22kV trên đất liền thuộc địa phận thị xã Sông Cầu; xây dựng mới tuyến cáp ngầm 22kV xuyên biển mạch đơn, chiều dài hơn 10km, nối từ trạm cắt 22kV Hòa An (xã Xuân Hòa, thị xã Sông Cầu) đến xã đảo Nhơn Châu; xây dựng trạm cắt 22kV Nhơn Châu, 2 trạm biến áp 22/0,4kV với tổng công suất 650kVA; xây dựng hệ thống viễn thông và cáp thông tin…

Đại diện EVNCPC chia sẻ, đảo Nhơn Châu là một trong các đảo tiền tiêu của Tổ quốc, có vị trí chiến lược đặc biệt quan trọng về qu

ốc phòng – an ninh cũng như phát triển kinh tế biển đảo; do vậy, việc đảm bảo cấp điện theo kế hoạch trong tháng 9 (trước mùa mưa bão) phục vụ nhân dân, cán bộ chiến sĩ trên đảo có ý nghĩa vô cùng quan trọng, thiêng liêng.

Theo báo cáo của Ban QLDA Điện nông thôn miền Trung (CREB), đơn vị trực tiếp quản lý dự án thì các gói thầu cung cấp vật tư, thiết bị, thi công cáp ngầm xuyên biển 22kV đều được triển khai đồng bộ theo đúng tiến độ đã đề ra.

Chi tiết tại: https://congthuong.vn/dien-se-ve-xa-dao-nhon-chau-136204.html

Project location

Other Construction

  • NAME OF PROJECT: Hai Anh Wind Power Plant in Quang Tri
  • LOCATION: Quang Tri
  • YEAR: 2024
  • PRODUCTS SUPPLIED: Underground aluminum cable AL/XLPE/PVC/DSTA/PVC-W 3x95mm² - 18/30(36)kV, Underground copper cable Cu/XLPE/PVC/DSTA/PVC-W 3x300mm² - 18/30(36)kV, Underground aluminum cable Al/XLPE/PVC/DSTA/PVC-W 3x300mm² - 18/30(36)kV
  • NAME OF PROJECT: Luong Hoa Residential Area
  • LOCATION: Luong Hoa Commune, Ben Luc District, Long An Province
  • YEAR: 2024
  • PRODUCTS SUPPLIED: AL/XLPE/PVC 4x185 – 0,6/1kV
  • NAME OF PROJECT: 500kV line Circuit 3
  • LOCATION: Ha Tinh
  • YEAR: 2024
  • PRODUCTS SUPPLIED: STEEL CORE ALUMINUM CABLE - ACSR 507/104 (Code 612 Crocus)
  • NAME OF PROJECT: Long Thanh International Airport
  • LOCATION: Dong Nai
  • YEAR: 2024
  • PRODUCTS SUPPLIED: LOW VOLTAGE CABLES AXV 240mm2 - 0,6/ 1kV 
  • NAME OF PROJECT: HAU GIANG BIOMASS POWER PLANT PROJECT
  • LOCATION: Hau Giang
  • YEAR: 2024
  • PRODUCTS SUPPLIED: Low and medium voltage underground cables
  • NAME OF PROJECT: 500kV Quynh Luu - Thanh Hoa line project
  • LOCATION: Nghe An - Thanh Hoa
  • YEAR: 2024
  • PRODUCTS SUPPLIED: Steel core aluminum conductor ACSR 400/51, Steel core aluminum alloy conductor AACSR 400/91, PHLOX 116 lightning protection wire
  • NAME OF PROJECT: Supply and installation of 11MVA electrical equipment for customers in Kratie province
  • LOCATION: Cambodia
  • YEAR: 2023
  • PRODUCTS SUPPLIED: AAC bare conductor 240mm2
  • NAME OF PROJECT: Nam Dinh 1 - Pho Noi 500kV Thermal Power Plant
  • LOCATION: Nam Dinh
  • YEAR: 2024
  • PRODUCTS SUPPLIED: ACSR 330/43 conductor cable, PHLOX - 116.2 lightning protection cable
  • NAME OF PROJECT: Krong Buk 1 wind power plant, Krong Buk district
  • LOCATION: Dak Lak
  • YEAR: 2020
  • PRODUCTS SUPPLIED: Medium voltage underground cable
  • NAME OF PROJECT: SUPPLY THE PROJECT RAISING THE LOAD CAPACITY OF THE 220KV VIET TRI - VINH TUONG TRANSMISSION LINE
  • LOCATION: Viet Tri - Vinh Luong
  • YEAR: 2022
  • PRODUCTS SUPPLIED: Aluminum conductor composite 507mm2 (ACCC507)